Change Your GETSHURE Shipping Address After Ordering
If you ordered from GETSHURE and need to change your shipping address, contact us as soon as possible by phone at (754) 812-1679 (Mon–Fri, 9:00 AM – 6:00 PM ET) or by email at contact@getshure.com with your order number (it starts with GS-). As long as your book hasn't shipped yet, we can update the address directly. If it already shipped, we'll walk you through the next step so your order still reaches you.
We're a small American publisher, and a real person answers the phone during business hours. That's the short version. Here's the full playbook, plus a quick look at what else your GETSHURE order gets you.
First, the fast answer: what to do right now
- Find your order number. Open your order confirmation email from GETSHURE. The order number starts with GS-.
- Reach us the fastest way you can. Phone is quickest during business hours: (754) 812-1679, Monday through Friday, 9:00 AM – 6:00 PM Eastern Time. Email works any time: contact@getshure.com.
- Tell us clearly what to change. Include your order number, your name as it appears on the order, the old address, and the full new shipping address (street, apartment/suite, city, state, ZIP).
- Wait for confirmation. We'll reply within 2 business days to confirm the update or explain the next step if your package has already shipped.
Don't place a second order to "fix" the first one. That just creates a duplicate charge you'd then need refunded. One message to us is all it takes.
Why contacting us works
GETSHURE is operated by MetaWise Enterprises, LLC, a Delaware limited liability company (Delaware file number 10336625). Our office address is 11772 W Sample Rd, Ste 103, Ofc 240, Coral Springs, FL 33065. You can verify all of that today, before you even email us.
Our books typically ship 3–5 business days after the order ships, which gives most customers a real window to catch an address mistake. Protection plans activate through the Getshure app the moment you sign in — those don't ship at all, so no address change is needed on the digital side.
What information to include in your email
The faster we have the right details, the faster we can fix it. Paste this template into your email to contact@getshure.com:
Subject: Address change for order GS-XXXXXX
Hi GETSHURE team,
Please update the shipping address on my order. Details below.
Order number: GS-XXXXXX
Name on order: [Your full name]
Email on order: [Email you used at checkout]
Old address: [Street, apt, city, state, ZIP]
New address: [Street, apt, city, state, ZIP]Thanks.
If you're not sure whether your order has shipped yet, that's fine — just send the message. We'll check on our end.
What if the order already shipped?
Once a hardcover is in the carrier's hands, we can't change the label from our side. But there are still good options:
Option 1: Forwarding
If the old address is somewhere you can still pick up mail (a past home, a family member's house, a previous workplace), the simplest fix is to have it forwarded or picked up. US mail forwarding can also help if you've already filed a change of address with USPS.
Option 2: Return to sender
If the package can't be delivered, it will usually be returned to us. Once we receive it back, we can reship to the correct address. Email us as soon as you notice the issue so we can watch for the return.
Option 3: Replacement or refund
If forwarding and return both fail, we'll work with you on a replacement or a refund of the book. Our refund policy gives you a 30-day money-back guarantee on plan charges and add-ons, and unused hardcovers can be returned within 30 days of delivery. We review shipping-related issues on a case-by-case basis so you aren't stuck.
How to avoid address problems next time
- Double-check autofill. Browsers sometimes fill in an old apartment number or outdated ZIP. Read every line before you click Place Order.
- Include your apartment or suite number. Missing unit numbers are the #1 reason books end up at the front desk, with a neighbor, or back on the truck.
- Use the address your ID matches, if possible. It makes delivery exceptions easier to resolve with the carrier.
- Keep your GETSHURE confirmation email. It has your order number (GS-…), a link to activate the app, and the email address for support.
What about your protection plan and the Getshure app?
Here's the good news: if you bought a GETSHURE protection plan, your shipping address has no effect on it. The plan and the Getshure app are delivered digitally, tied to the email you used at checkout.
How to activate the app (takes a few minutes)
- Open your GETSHURE order confirmation email.
- Tap the download link in that email. On Android you can also use the Getshure app on Google Play. On iPhone, use the download link in your order email.
- Install the app and sign in with the same email address you used on your GETSHURE order.
- Your plan features unlock after sign-in. Protection is not active until you sign in.
Need a walkthrough with screenshots and troubleshooting? See Getshure App Sign In: How to Activate After Your Order.
What the Getshure app actually does
Your plan determines which of these features you get, and they're all built to reduce the time you spend chasing scammers, trackers, and data brokers by hand:
- Scam Shield. Identifies likely scam and spam callers, helps block robocalls, and lets you look up an unknown number before you call back.
- Encrypted private vault. A locked space for sensitive photos and files, protected by Face ID or a passcode.
- Data broker removal. Sends removal and opt-out requests to people-search sites and data brokers. Each site decides when it removes a record, but you don't have to chase them one by one.
- Breach check. Shows whether your email or passwords appear in known data breaches so you can change what matters.
- Photo Guard. Reverse-image search so you can see where your photos have been reposted.
- Family location sharing. Simple location sharing for people you trust.
- Tracker blocking and safer browsing on public Wi-Fi. Cuts down on who's watching when you're on the go.
- Browsing-history eraser and a phone security score with clear steps to improve it.
No app can block every scam, tracker, or data leak — anyone who promises that isn't being straight with you. What the Getshure app does is catch more and help you recover faster.
Why a protection plan is worth it (even with a book)
Our hardcovers teach you how to think about AI scams, family safety, and privacy. The protection plan is how you act on it every day without turning it into a part-time job.
Pricing is simple
Protection plans are a one-time payment — $9.99, $29.99, or $79.99 depending on which plan you choose. Nothing renews. You are not charged again for the plan. See the details in our billing terms so you know exactly what you're agreeing to before you buy.
Optional add-ons (Past Reset, Data Removal, International Data Removal, Scam Shield, Identity Theft Restoration) are also one-time charges — and only billed if you actually tap the purchase button on that specific offer.
You're protected by a 30-day guarantee
If you change your mind within 30 days, email or call us with your order number and we'll refund the plan charge or add-on. Refunds are processed within 2 business days on our end; banks usually show the credit within 5–10 business days. Full details in our refund policy.
You can reach a human
Our support line is (754) 812-1679, Mon–Fri, 9:00 AM – 6:00 PM ET, and email is contact@getshure.com. See our contact page if you'd like all of that in one place.
Address change checklist
- Locate your order number (starts with GS-) in your confirmation email.
- Call (754) 812-1679 during business hours, or email contact@getshure.com any time.
- Include your name, old address, and complete new address.
- Watch for our reply within 2 business days.
- If your order already shipped, ask us about forwarding, return-to-sender, or replacement.
- Remember: your protection plan and app are tied to your email, not your mailing address.
Related reads
- GETSHURE Order Tracking: Check Your Book and Plan Status
- GETSHURE Shipping Time: When Your Book and Plan Arrive
- GETSHURE Customer Service: Phone, Email and Hours
- GETSHURE Refund Policy: 30 Days, No Reason Needed
Ready to fix it? Here's your next step
If you need to change your GETSHURE shipping address, don't wait. Pick up the phone at (754) 812-1679 or email contact@getshure.com with your GS- order number and the new address. The sooner we hear from you, the more likely we can update the label before it ships.
And while you're sorting out the mailing side, don't forget the digital side of your order: install the Getshure app, sign in with the email on your order, and turn on the protection you already paid for. That's where the real day-to-day value lives.
Frequently asked questions
How quickly do I need to contact GETSHURE to change my shipping address?
As soon as possible. Books typically ship 3–5 business days after the order ships, so the sooner you reach us by phone at (754) 812-1679 or email at contact@getshure.com, the more likely we can update the address before the label is created.
Can I change my shipping address through my account instead of contacting support?
The fastest and most reliable way is to call or email us with your GS- order number. That way a real person updates it on the order record and confirms the change back to you in writing.
Does changing my shipping address affect my GETSHURE protection plan?
No. Your protection plan and the Getshure app are tied to the email address you used at checkout, not your mailing address. Sign in to the app with that email and your plan features unlock.
What if my GETSHURE book was delivered to the wrong address?
Email contact@getshure.com with your order number right away. If forwarding or return-to-sender doesn't work, we'll help with a replacement or a refund under our 30-day policy. Damaged or wrong deliveries should be reported within 7 days with a photo.
Will I be charged again if GETSHURE has to reship my book?
Reship decisions are handled case by case. If the issue was on our end, we cover it. If the package was returned because of an incorrect address you provided, we'll walk you through the options — including a refund under our 30-day money-back guarantee.
This guide is general information for US readers, not legal or financial advice. If you think you have been scammed, contact your bank and report it at reportfraud.ftc.gov. Questions about a GETSHURE order: contact@getshure.com or (754) 812-1679.